Project Groups 2011
Group: 1. Catch and Throw Ball and Beam with JGrafchart
Advisor: Karl-Erik Årzén
Equipment: Old Ball and Beam
Status: Project, oral and report approved
Participants:
- Johanna Lakso - tf07jl6 at student dot lth dot se
- Mattis Wahlby - tf07mw0
- Michael Petersson - michael dot pettersson at gmail dot com
- Henrik Knutsson - henrik_860117 at hotmail dot com
Group: 2. Operator Interaction using Android
Advisor: Philip Reuterswärd
Equipment:
Status: Everything OK
Participants:
- Dennis Axelsson - pi07da2
- Mattias Ljunge - dt06ml3
Group: 3. (Joint Predictive) Control of the Helicopter with Gainscheduling (possibly in C)
Advisor: Karl Berntorp
Equipment: Helicopter
Status: Oral OK
Participants:
- Alessio Iovine - alessio dot iovine dot 559 at student dot lu dot se
- Kevin Taddei - ktaddei at etud dot insa-toulouse dot fr
- Céline Mathias - cmathias at etud dot insa-toulouse dot fr
- Bernhard Karaj - bernard dot karaj dot 714 at student dot lu dot se (Not Predictive Control)
Group: 4. Operator Interaction using Android
Advisor: Philip Reuterswärd
Equipment:
Status: Everything OK
Participants:
- Antoine Pelliccia - antoine dot pelliccia at gmail dot com
- Nicolas Delanoe - nicolas dot delanoe dot 458
Group: 5. Catch and Throw Ball and Beam Process
Advisor: Karl-Erik Årzén
Equipment: Old Ball and Beam
Status: Project, oral and report approved
Participants:
- Johanna Schneider - joh_schneider at gmx dot de
- Paolo Mattachini - paolo dot mattachini at gmail dot com
- Daniele Ioli - daniele dot ioli at mail dot polimi dot it
- Farzaneh Sadat Firouzabadi - f dot firouzabadi at gmail dot com
Group: 6. Lego Mindstorm
Advisor: Jerker Nordh
Equipment: Lego NXT + battery, 2x Motor, 2x Acc, 2x Gyro
Status: Project OK, oral OK, Report OK, Demo OK
Participants:
- Mattias Nordahl - dt07mn0
- Emil Einarsson - dt07ee3
- Daniel Nilsson - dt07dn0
Group: 7. Remote Control of Lego Segway using Android
Advisor: Jerker Nordh
Equipment: Lego Demo Segway
Status: Project OK, oral OK, Demo OK, Report OK
Participants:
- Simon Kämpe - dt06sk4
- Johannes Jakobsson - dt06jj0
Group: 8. Control using Android
Advisor: Philip Reuterswärd
Equipment:
Status: Everything OK
Participants:
- Fredrik Larsson - dt07fl2
- Mikael Möller - dt07mm5
- Shahdi Abdu-Rahman - dt07sa6
- Sadat Tokhi - dt07st6
Group: 9. Tiny EDF-based real-time kernel
Advisor: Philip Reuterswärd
Equipment: No process
Status: Everything OK
Participants:
- Filip Karlsson - dt08fk5
- Jimmy Assarsson - dt08ja2
- Linus Karlsson - dt08lk9
- Paul Bibby Maxwell Steneram - dt08ps7
Group: 10. (Joint Predictive) Control of Helicopter with Gain Scheduling
Advisor: Karl Berntorp
Equipment: Helicopter
Status: Project and report approved
Participants:
- Jennie Olsson - olsson dot jennie at gmail dot com
- Aminda Ingulfsson - aminda dot ingulfsson at gmail dot com
- Josefin Berner - nifesojan at hotmail dot com
- Jimmie Jönsson - tf07jj5
Group: 11. Lego Mindstorm
Advisor: Jerker Nordh
Equipment: Lego NXT + battery, 2x Motor, 2x Ultra sound, 2x Light
Status: Project OK, oral OK, Report OK, Demo OK
Participants:
- Kristoffer Sätermark - dt08ks6
- Eric Johansson - dt08ej6
- Joakim Marculescu - dt08jm6
Group: 12. (Joint Project) Adaptive control of an Inverted Pendulum (PC6)
Advisor: Magnus Linderoth
Equipment: Furuta pendulum
Status: Oral OK, report OK, functionality OK
Participants:
- Christer Engblom - christerron at gmail dot com
- Kristoffer Rosquist - tf06kr8
Group: 13. Catch and Throw Ball and Beam
Advisor: Karl-Erik Årzén
Equipment: Old Ball and Beam
Status: Projekt, report and oral presentation approved
Participants:
- Linus Svensson - dt07ls5
- Edward Linderoth-Olson - dt06el8
- Andreas Salomonsson - dt07as3
- Magnus Brange - magnus@brange.nu
Group: 14. Lego Mindstorm
Advisor: Karl Berntorp
Equipment: Lego NXT + battery, 2x Motor, 3x ultrasoundsensor
Status: Project OK, report approved
Participants:
- Johan Paulsson - dt08jp8
- Jacob Ferm - dt08jf0
- Erik Söderqvist - dt08es8
Group: 15. Special - Projektkurs
Advisor: Jerker Nordh
Equipment: Lego Segway
Status: Oral OK
Participants:
- Kim Smidje - dt07ks3
- Henrik Nilsson - dt07hn6
Group: 16. Compensation for network delays
Advisor: Karl-Erik Årzén
Equipment: DC Servo
Status: Project and report approved, Oral OK
Participants:
- Joakim Birgersson - dt08jb2
- Christian Olsson - dt08co9
- Niclas Nordin - dt08nn1
Group: 17. User Interaction Using Android
Advisor: Philip Reuterswärd
Equipment:
Status: Everything OK
Participants:
- Daniel Lehtonen - dt08dl4
- Emil Selinder - dt08es7
Group: 18. (Joint Predictive) Control of an Inverted Pendulum (PC5)
Advisor: Magnus Linderoth
Equipment: Furuta Pendulum
Status: Functionality, and report approved
Participants:
- Mikael Göransson - goransson dot mikael at gmail dot com
- Peter Wodzynski - et07pw1 (Real-Time Systyems only)
- Henrik Olsson - henrik dot lkpg at hotmail dot com (Predictive Course Only)
- Hrvoje Corluka - et07hc5 at gmail dot com (Predictive Course Only)
Group: 19. Control of the linear pendulum
Advisor: Magnus Linderoth
Equipment: Linear Pendulum
Status: oral OK, functionality OK, report OK
Participants:
- Johan Schantz - johan dot schantz at gmail dot com
- Babak Rajabian - babak dot rajabian at hotmail dot com
- Thomas Daum - daun dot thomas at gmail dot com
Group: 20. Eget Projekt
Advisor: Jerker Nordh
Equipment:
Status: Project OK, Report OK, Demo OK
Participants:
- August Bjälemark - agge dot bjalemark at gmail dot com
- Hannes Åman Bergkvist
Group: 21. Operator Interaction using Android
Advisor: Philip Reuterswärd
Equipment:
Status: Everything OK
Participants:
- Pontus Niltoft - dt07pn4
- Johan Mattsson - dt07jm1
Group: 22. (Joint Predictive) Adaptive Control of the See-Saw Process
Advisor: Karl Berntorp
Equipment: See-saw
Status: Project, report and oral presentation approved
Participants:
- Johan Fogelberg - et08jf9
- Johan Tunhag - et08jt5
- Johan Larsson - larsson1988 at gamil dot com
- Oscar Sandström - oscar dot op dot sandstrom at gmail dot com
Group: 23. Joint Predictive - Special, PC6, PC8 - Diskutera med dem
Advisor: Jerker Nordh
Equipment:
Status: Project OK, oral OK, Demo OK, Report OK
Participants:
- Rasmus Kjellstrand - ras dot kje at gmail dot com
- Ville Akujärvi - E08
- Martin Holmstrand - E08
Group: 24. Eget projekt
Advisor: Karl Berntorp
Equipment:
Status:
Participants:
- Tobias Petersen - tobias dot alex dot petersen at gmail dot com
Group: 25. Vision Feedback for the Ball and Beam Process
Advisor: Magnus Linderoth
Equipment: Ball and Beam
Status: Oral OK, functionality OK, report OK
Participants:
- Kristina Silverbåge - et07ks6
- Mårten Kjellsson - e04mk
- Oscar Hjerpe - et06oh4
- Victor Garcia Paje - victor dot gpaje at gmail dot com
Group: 26. Special Project
Advisor: Magnus Linderoth
Equipment:
Status: oral OK, functionality OK
Participants:
- Olof Troeng - olof dot troeng at gmaildot com
- Nils Bengtsson - nebengtsson at gmail dot com
Group:27. Event-based PID Control
Advisor: Karl-Erik Årzén
Equipment: DC Servo and Ball and Beam
Status: Project, report and oral presentation approved
Participants:
-
Robin Karlsson - pi07rk3
- Elisabeth Jeppson Krell - pi07ej9